Airport Drive Sidewalk

Airport Drive Sidewalk

What

New sidewalk 5 ft, accessible

Where

Airport Drive West St to the Rec Fields

Status

In design Fuss & O’Neill

Construction

Summer 2027 goal, not final

Funding

$240,000 grant federal, through VTrans

Questions

Town Administrator (802) 453-2410

What is happening and why

Airport Drive has no sidewalk. People walking to Mount Abe, the Recreation Fields, the Hub Teen Center and skate park, the American Legion and the Bristol Trail Network walk in the road with cars, trucks and school buses, or on a dirt shoulder.

The plan: a 5-foot concrete sidewalk on the east side of Airport Drive, built to accessibility (ADA) standards, with a 5-foot grass strip between the sidewalk and the road. It runs about 1,000 feet, from the existing sidewalk on West Street (Routes 116 and 17) north to the existing path beside the Recreation Fields that leads to Mount Abe.

It also gives Firehouse Drive residents a safe way downtown, serves people who park at the school for downtown events and creates a walking loop.

This is the route chosen from the 2022 scoping study. Building it may mean moving a few utility poles, a fire hydrant and part of the fence at the school gate. Lighting and other details will be settled during design.

Aerial plan of Airport Drive showing a 5-foot concrete sidewalk with a 5-foot grass strip on the east side, the utility poles and hydrant to be moved, and where it connects to existing sidewalks.
The chosen route, Alternative 2, from the 2022 scoping study by DuBois & King. The top strip is the south end at West Street; the bottom strip continues north to the school. Preliminary, not the final design. Click to enlarge.

Timeline

WhenWhat
2022Scoping study by DuBois & King, with public meetings on August 8 and September 14
Nov 2023Selectboard authorizes a Transportation Alternatives grant application
Mar 2024VTrans awards $240,000 in federal funds
Sep 2024Grant agreement signed. The project must be finished by October 2028.
Dec 2024Selectboard approves the Addison County Regional Planning Commission as project manager
Jul 2025Selectboard approves Fuss & O’Neill as design engineer
Oct 2025Design kick-off with the engineer, the Regional Planning Commission, VTrans and the Town
2026Design
Spring 2027Goes out to bid (planned)
Summer 2027Construction (goal)

Bid and construction dates are goals from the engineer’s proposal and the project kick-off. The final schedule will come out of design.

Common questions

Which side of the road?
The east side, the same side as the Recreation Fields and the school.

Will there be streetlights?
Lighting will be decided during design.

What happens during construction?
Details on traffic, timing around the school year and access to the Recreation Fields will be posted here before work starts.

Who pays for it?
A $240,000 federal grant covers 80% of the 2023 cost estimate. The grant amount is capped. The local share is planned to be split between the Town’s Sidewalk Reserve Fund and the Mount Abraham Unified School District.

How do I share a comment or concern?
Contact the Town Administrator. Updates will be posted on this page.

Latest updates

Oct 15, 2025

Design kick-off

The project team met to start design, with construction targeted for summer 2027.

Jul 28, 2025

Design engineer approved

The Selectboard approved Fuss & O’Neill, hired through the VTrans At-the-Ready program.

Dec 16, 2024

Project manager approved

The Addison County Regional Planning Commission will manage the project for the Town.

Mar 25, 2024

Grant awarded

VTrans awarded $240,000 in federal Transportation Alternatives funds.

Funding

Estimated cost: $300,000.

  • $240,000 federal Transportation Alternatives grant through VTrans (capped)
  • $60,000 local match, planned to be shared by the Town’s Sidewalk Reserve Fund and the Mount Abraham Unified School District

Estimate from the 2023 grant application. It will be updated during design.

Documents

Scoping study and appendices

PDF, DuBois & King, October 2022

Route plan, Alternative 2

Image, from the 2022 scoping study

Alternatives presentation

PDF, September 14, 2022 public meeting

Questions

Contact

Greg Faust, Town Administrator

Phone

(802) 453-2410

Project manager

Addison County Regional Planning Commission

Design engineer

Fuss & O’Neill

Funding

VTrans Transportation Alternatives Program

Thank you for your patience as we make Airport Drive safer for walking.